China flue gas desulfurization scrubber
suppliersWaste Flue Gas Desulfurization Scrubber / Gas Cleaner Industrial Fiberglass GRP FRP Tower
Price: $1500-5000 per set,USD 1500-5000 per set,to be negotiated
MOQ: one set ,to be negotiated
Delivery Time: 15 days ,To be negotiated according order
Brand: YONGDA
450kg CO2 Wet Flue Gas Desulfurization Air Scrubber for PP Manufacturing Equipment
Price: $2,740.00/pieces 1-2 pieces
MOQ: 1
Delivery Time: Negotiable
Brand: YITE
Customized Capacity Spray Desulfurization Tower / Denitrification for Flue Gas Desulfurization
Price: Negotiate
MOQ: 1 set
Delivery Time: Negotiable
Brand: Delong Environmental Protection
Heavy Industry Go-To For Wet Flue Gas Desulfurization Equipment
Price: $14,000.00/pieces 1-1 pieces
MOQ: 1
Delivery Time: Negotiable
Brand: Junxu
Flue Gas Desulfurization Wastewater Treatment Plant For Textile Industry High-Efficiency Reactor
Price: Negotiatial
MOQ: 1 unit
Delivery Time: Negotiatial
Brand: HDCY
Integrated Or Integral Comb Fin Tube Flue Gas Desulfuration Short Fin Pitch Anti Abrasive Less Dust
Price: Negotiable
MOQ: 1 Set / Sets 10tons
Delivery Time: 60 days
Brand: HD Boiler
Power Plant DeNOx System Exhaust Scr Waste Flue Gas Desulfurization Particular Reduction
Price: $50000/pc-$200000/pc
MOQ: 1 pc
Delivery Time: 10-30days
Brand: Grace
Custom Flue Gas Desulfurization Treatment System Porous Membrane Material
Price: Negotiable
MOQ: 1 PC
Delivery Time: 7-30days
Brand: SDN
H2S Biogas Purification Equipment 10ppm Wet Flue Gas Desulfurization
Price: USD20000~100000/set
MOQ: 1set
Delivery Time: 15~30working days
Brand: JCWY
Flue Gas Desulfurization Material Handling Blower Industrial Boiler Fan
Price: 300-5000 USD
MOQ: 1 Set
Delivery Time: 15-35 Days
Brand: SIMO
Flue Gas Desulfurization Hastelloy Mesh Fluorine Chemical Industry
Price: Negotiable
MOQ: 1 roll
Delivery Time: 7 work days
Brand: HUIHAOKST
50 μm Vacuum Filter Belt , 1500gsm Belt Press Filter Cloth For Flue Gas Desulfurization FGD
Price: Negotiable
MOQ: 1 Piece
Delivery Time: 15-30 Work Days
Brand: HUADING
Flue Gas Desulfurization Gypsum Dewatering 500L/Hour Productivity Motor Core Components
Price: $6,890.00/sets 1-1 sets
MOQ: 1
Delivery Time: Negotiable
Brand: Better
Wet Flue Gas Desulfurization Purification Tower
Price: $500.00 - $30,000.00/sets
MOQ: Negotiable
Delivery Time: Negotiable
Brand: RECYCLE
Flue Gas Slurry Circulating Desulfurization Pump Motor Drive
Price: USD 1500-5000 per set
MOQ: 1 set
Delivery Time: 20-35 days after receiving the deposit
Brand: HUATAO
High Temperature Air Flue Gas Ducts Non Metallic Expansion Joints Fluorine Rubber Skin For Desulfurization
Price: Negotiable
MOQ: 1
Delivery Time: 7-30 days
Brand: HNEENERGY
PP Wet Scrubber Gas Desulfurization Tower Waste Gas With Pump Blower
Price: USD 702/set
MOQ: 1 set
Delivery Time: 25~30 days
Brand: Qiaoda
Nox Flue Gas Treatment System Multistage Jet Type Wet Gas Scrubber
Price: negotiate
MOQ: 1 set
Delivery Time: 30 days
Brand: gremet
Flue Gas Purification Hcl Fume / Ammonia / So2 Scrubber System 300 Kg
Price: Need to negotiate
MOQ: Need to negotiate
Delivery Time: 15-20work days
Brand: Yanjiang
Zr-D13D Flue Gas Moisture Analyzer / Flue Gas Measuring Instrument
Price: USD 11500 ~12000 PER PCS
MOQ: 1
Delivery Time: 5-7 work days
Brand: HiYi